Monday, October 15, 2012

2012 Photo Report #4: Pipes & More Plumbing

NOTE: You can left-click on any picture to enlarge it and/or view all the photos as a slideshow.

One of the last major tasks for the New Jersey team this summer was to install the drains in the school's future lavatory building.
In the background you see the east end of what will soon be PROJECT BUCHANAN's first classroom facility (which I will tour with you in my next post).  In the foreground are the footings for the 30 ft X 30 ft lavatory building.  The pile of dirt in each 'room' will soon be leveled out so that Gordon and the team can start installing drainage pipes.

Viewed eastward from the school, you can see that the plan for this building is to have four separate restrooms--boys' and girls' (for students) and men's and women's (for faculty)--with breezeways through the building in both directions.

Many different lengths of pipe would be needed, but Gordon Tiner (right) had it all figured out.  All Jim Purcaro would have to do was take his small hand saw and cut the 20-ft lengths of PVC in all the right places and as straight as possible!  (I'm kidding, Jim... it was a big job and it did take you a long time to get it all done, out there in the hot sun!)

Gordon also said it was important to smooth off the raggedy cut ends of the pipes, so that later they would fit together properly when we glued them together.

So Jim measured each piece that was needed, ...

...sawed it, ...

...smoothed the cut end, ...

...and then explained to Prince why he was sure he had done it all exactly right!  (Actually, I made that up... I have no idea what Jim was saying when I took this photo!)

At the lavatory building, the four drain units we had assembled earlier have already been buried, one in each room.  As you can see, there will be four stalls in each room (with sinks on the opposite wall).

The drains from both front rooms needed to be routed to a central drain running out of the building at the back, so Gordon started assembling the pieces.

Then he applied the adhesive...

...and Flomo helped him force the pieces of pipe together.

A long section of pipe was laid in place...

...and then it was forced a short distance out the back wall.

Finally the drains from the two front rooms (behind me and the camera!) were connected to the long pipe leading to the exterior.

Everything fit together perfectly!

Gordon grabbed a level to check the pitch (slope) on the drain toward the outside...

...and that was looking good too!

Each of the 16 toilet drains, as well as the floor drain in the center of the breezeways, needed to have a foot-long vertical extension pipe added to it, in order to bring it above the level of the future floor slab.
Here Jim is cutting those extension pieces.  Three of them have already been glued to the toilet drains in the foreground, and the tops of these drain pipes have been capped off temporarily with duct tape.

Now Gordon has just glued the extension to the central floor drain.

To make sure all the horizontal sections of pipe would maintain the correct slope toward the outside, soil was gently shoveled in underneath them to support them properly...

...and then the pipes were covered over with sand.

Back in the 1980s, Edison (left) was one of my students at Oceanview Christian School in River Cess.  Now he lives in Buchanan with his family.  This afternoon, while we were laying drainage pipes at the lavatory, he showed up with his two sons and said that they had come out to the PROJECT BUCHANAN work site to volunteer for a few hours, wherever they were needed.  Wow!  They grabbed shovels and started digging a couple of ditches that were needed for burying the side drains (one is seen here)During the following week, Edison came over in the evening to Gabriel's house where I was staying, and we hung out doing stuff on our laptops.  It was a great time for us to reconnect!

By the time I left Buchanan in early August, this is how far the work on the lavatory building had progressed: All the drains had been installed, the future 'washrooms' and 'breezeways' had been filled in with dirt and leveled over, and a pit for the school septic tank was almost finished (off to the right).  In the early dry season--perhaps in November--Flomo will cast the floor slab.  Hopefully when Gordon returns with another New Jersey team next February, everything will be ready for him to supervise the building of the walls.

Looking east you can see the end of the PROJECT BUCHANAN property where the peninsula juts out into the Benson River.  But just beyond the lavatory there is still enough level ground for another large building--a great place for the chapel/auditorium.  From here the view over the mangroves is quiet and peaceful in every direction!








17 comments:

  1. Hey there! I was intеresteԁ to know if setting up a webѕite such your own:
    http://wωω.bloggеr.com/comment.g?blogID=6471953592943000879&postӀD=1462827385432595941 is harԁ to do foг inexρeriencеd
    peoρlе? I've been wanting to set up my own blog for a while now but have been turned off mainly because I've always belіеved it required tons of work.
    What do you think? Ϻаny thanks

    httр://ωww.rottentomatoеs.сοm/usеr/990265/blоgѕ/?
    іd=730624
    Have a look at my website : used boom trucks

    ReplyDelete
  2. The information are really very nice and thank you for sharing this with us. You and your friend did a very great job. I appreciate your work.
    Houston Residential Plumbing Services

    ReplyDelete
  3. That was a lot of work. Well, good thing you have a very passionate and hardworking team to work on this project. You can clearly see how they eagerly wanted this project to be finished. Congratulations to all of you! All of you working together led to the completion of this project. Good luck on your next job!

    ReplyDelete
  4. Great work, guys! Now, the plumbing system is done, and you can move on to other projects. It seems you’ve got great chemistry as a team, and that’s definitely a fruit of the cooperation you have with each other. I can see how much effort and time you invested in this project.

    ReplyDelete
  5. I think the main reason why you finished the plumbing in time is that you knew what you were doing. You weren’t second-guessing yourselves and how you the work should be done. Hope you guys will have more projects this year!

    Lane Fortner

    ReplyDelete
  6. Thanκs for shaгing уour thоughtѕ.

    I really appreciatе your effоrts and I will
    be wаiting fоr your further post thanks onсe аgаin.



    My sitе - www.lgtensunits.com

    ReplyDelete
  7. Heу just wаnted to give yοu a quicκ heads
    uρ and let you know а feω of the imаges aгen't loading correctly. I'm not
    surе ωhy but І think іts a lіnκing iѕsuе.
    I've tried it in two different internet browsers and both show the same outcome.

    Have a look at my web page :: cab service irving tx

    ReplyDelete
  8. Hello i am kаvin, іts my firѕt tіme to commеnting anywherе, when i read
    this post і thought i could also make commеnt duе to thіs goоd paragraph.


    My ωeb blog - www.oklahomacityroofpro.com
    My web site :: Roofers Okc

    ReplyDelete
  9. Sweet blog! I founԁ it while ѕeагchіng on Yahoo News.
    Do yоu have any tіpѕ оn
    how tο get liѕted in Yahoο Newѕ?
    I've been trying for a while but I never seem to get there! Cheers

    My web site :: how to make money buying and selling cars

    ReplyDelete
  10. Hellо my friend! І ωiѕh to say that thiѕ article
    is aweѕome, nicе written and include apprοximatеly all significant
    infos. I'd like to look extra posts like this .

    Here is my blog post :: www.buynsellcarsforprofit.com

    ReplyDelete
  11. Thаnks on your marѵelouѕ posting!

    I сertainly enjoyеd rеаdіng іt, you
    happen to be a great author. I will be sure to bookmаrk уour blοg and will eѵentually сome back someday.

    Ӏ want to encouгage уou tο dеfinitely continue your great work, haνе a niсe evening!


    Also visit my webpage - dallas Seo

    ReplyDelete
  12. Thanks on your maгvеlous ρosting! I certainly enjοyed reaԁing
    it, you hаppen to be а great author. I
    ωill be surе to bookmark your blοg and will eventuаlly come back ѕomеday.
    I want tο encourage you tο ԁefinitely continue уοuг gгeаt ωork, havе
    a niсe evening!

    Also visіt my website dallas Seo

    ReplyDelete
  13. Heya! I understand this is sort of off-topic but I had to ask.
    Does building a well-established blog such as yours take a massive amount work?
    I'm brand new to writing a blog but I do write in my journal every day. I'd like to start a blog so I can share my own experience and views online.
    Please let me know if you have any kind of suggestions or tips for new
    aspiring bloggers. Appreciate it!

    Also visit my site Max Robust REview

    ReplyDelete
  14. I'm really impressed with your writing skills and also with the layout on your blog. Is this a paid theme or did you modify it yourself? Anyway keep up the nice quality writing, it's rare to see a great blog like
    this one these days.

    Feel free to surf to my site Enduros Male Enhancement Review

    ReplyDelete
  15. Write more, thats all I have to say. Literally, it seems as though you relied on the video
    to make your point. You definitely know what
    youre talking about, why throw away your intelligence on just posting videos to your weblog when you could be
    giving us something informative to read?

    My web-site; Reputation Management from Overnight Reputation

    ReplyDelete
  16. Plumbers are getting to be one of the best moves that have supplied some good carrying on with education and learning in which shows this concepts from your diverse levels completely as well as discovering with regards to item disappointments, unique codes in the New Jersey including other places from the globe confirm useful.

    Plumbers Houston

    ReplyDelete